Error: Could not detect post ID. Debug: get_the_ID()=6762, $post->ID=6762, post_type=page

Description of the construction

Rehelepa phase I homes were built by

Description of the construction

CONSTRUCTION

FOUNDATION

Strip foundation.

FACADE

Plastered, partially covered with wood boards and facade plates.

EXTERIOR WALLS

Full concrete hollow concrete block.

PARTITION WALLS OF APARTMENTS

Full concrete hollow concrete block or covered lightweight block wall.

INTERIOR WALLS OF APARTMENTS

Plasterboard walls on a steel frame.

INSERTED CEILINGS

Reinforced concrete hollow block or monolithic concrete inserted ceiling.

The height of ceilings is 2,6 m minimum. The height of the inserted ceilings in the apartment depends on the communications, but the minimum height is 2.3 m.

ROOF

Reinforced concrete hollow concrete block, insulation, SBS roll roofing.

BALCONIES AND TERRACES

Balconies are built on console steel beams.

Balconies have a concrete floor or PVC covering. Wooden decking is not installed on balcony floors.

Balcony railings are metal railings with a vertical design.

Terraces are finished with PVC or SBS roll-on waterproofing. In the Phase II buildings, wooden decking will also be installed on the ground-floor terraces. The terraces are separated from each other by planter boxes.

In the Phase I buildings, there is also a shared communal terrace area between the two buildings, intended for use by all residents.

WINDOWS

Triple-glazed plastic windows.

COMMUNICATIONS

ENERGY-EFFICIENCY

A-energy class, solar panels on the roof.

Readiness to charge four electric cars in the underground parking lot for every house.

Elevator

There is an elevator in the building.

HEATING SYSTEM

The building has a hybrid heating in the form of gas and an air-to-air heat pump.

Water floor heating in the apartments.

The bathrooms also have extra electric floor heating as comfort heating.

Radiator heating in public spaces and in the stairwell.

VENTILATION

Energy-efficient heat recovery forced ventilation with an apartment-specific ventilation device, that is controllable from your mobile device.

In the Phase II buildings, cooling readiness will be provided for all apartments.

WATER AND SEWAGE

Central domestic water and sewerage, remotely readable water meters.

ELECTRICITY AND WEAK CURRENT

Electrical installation and cabling of data communication systems according to the apartment spatial plan, the electrical and weak current switchboard is located in the wardrobe closet of the apartment

Remotely readable electricity meters.

Data transmission up to the weak current switchboard of the apartment with an optical cable, inside the apartment with a CAT cable.

Door phone system can be controlled from your mobile device.

* The images used on the website are illustrative and may differ from the final living environment

Financing

Description of the construction
Description of the construction
Description of the construction
Description of the construction
Description of the construction